Central Communication Port selected the contractor of the key investment – a high-speed railway tunnel close Łódź. The PORR consortium will implement the task for PLN 1.761 billion, offering the best price and experience from the 5 tenders considered.
A tunnel that changes the communication map of Poland
The investment is part of the alleged ‘Spry No 9’ – railway line No 85 which to 2032 connect Warsaw and the future CPK Airport with Łódź and then with Wrocław and Poznań. Construction will begin this year.
Maciej Lasek, the government's CPK proxy, emphasises that it is not only an component of the railway network, but besides development impulse for the full region:
“The long-distance tunnel will bring Warsaw closer to Łódź and make unrivalled travel times between the largest centres of Poland”.
Record parameters: The longest and widest tunnel in Poland
The planned tunnel will have:
- 4.6 km long,
- diameter approx. 14 meters,
- two tracks enabling trains to run in both directions at velocity up to 160 km/h.
It'll be the longest and widest single-string railway tunnel in Poland.
Safety and pre-construction preparations
Filip Czernicki, president of the CPK, notes:
“One of our most crucial tasks is to hollow the tunnel while maintaining maximum safety for the inhabitants of Łódź”.
Therefore, before the beginning of the works, a contract was signed with the company Albraco for execution 70 method and building studies in the investment area. Additional geotechnical studies will be carried out by the contractor at the phase of the implementing project.
Łódź – Central Railway Node
High-speed trains will halt at Łódź Fabryczna station, and the tunnel will bring them to the surface close the property Retkinia. From there, the way will lead westwards – towards Sierodwhere the episode to Wrocław will begin.
Preparatory work is presently underway, including:
- strengthening the foundations of the Łódź Cultural House,
- construction of starting and reception (Fabryczna) chambers.
KDP: velocity up to 350 km/h and a fresh travel era
Though in the tunnel the trains will decision at velocity 160 km/h, on another episodes the KDP line will let to accomplish even 350 km/h. This. complete change in Polish communication, and the boat will become key transport hub.
CPK: Controversy and Government Plans
At the end of March this year, 36 appeals concerning the location decisions of the CPK, which delays the project. Patrick Wild Association Yes for CPK comments:
"It's truly hard to explain it differently than diversion".
June Prime Minister Donald Tusk announced the decision on the CPK, announcing that Poland will become ‘one large megalopolis’. In his vision:
- airport close Baranov is expected to arise to 2032,
- regional airports will be expanded,
- Polish Airlines LOT to develop, though – as he admitted – ‘gigants will not catch up’.
The key component of the task is ‘Y Greek’ – KDP line connecting Warsaw and Łódź with fork on Poznań and Wrocław.
Summary: The tunnel that connects the future
The tunnel under Łódź is investment of national and global importance, the foundation of modern transport network. Thanks to it, the journey between the biggest cities of Poland will take less than 2 hours, and Łódź will gain position Central Communication Node.
You're getting a pension? ZUS closely monitors your income – exceeding the limits threatens to suspend benefits!12 April 2025
In 2025, the Social Insurance Institution (ZUS) intensified control of the incomes of persons collecting social pension. Any excess of fixed income thresholds may consequence in a simplification or suspension of payment
Deportations of foreigners from Poland: Ukrainian has already left the country and Albanian awaits deportation12 April 2025
The Border defender reported further deportations of foreigners sentenced in Poland. 1 of them has already left the country, the another is waiting for expulsion. Check the details. We recommend: 35-year-old Ukrainian detained
Revolution in Łódź: CPK selected the contractor of the largest railway tunnel in Poland12 April 2025
Central Communication Port selected the contractor of the key investment – a high-speed railway tunnel close Łódź. PORR consortium will realize the task for PLN 1.761 billion, offering the best price
Continued here:
Revolution in Łódź: CPK selected the contractor of the largest railway tunnel in Poland