Technical services are working on securing the traction network, which was damaged after the train entered the Mazowieckie Railways; the repair of the network will most likely take place by morning on Wednesday – reported Rafał Wilgusiak from the press squad of PKP Polish Railway Lines.
The PKP PLK press squad reported that on Tuesday around 11 a.m. the train of the Mazowieckie Railway entered the most likely lowered traction network and broke it down at a dimension of respective twelve meters, while damaging the pantograph in the warehouse.
As a result, the train failed – Rafał Wilgusiak of PKP PLK transferred.
– He had to be pulled down by a combustion locomotive, which was disposed of from the Warsaw Grochów station," he added. The warehouse was downloaded around 3 p.m.
At the same time, a network train and an energy ambulance were sent to the site.
– method services are presently working on securing the traction network. According to them, repairing the network will last until the early morning hours on Wednesday. Until then, the selected trains of the Fast Urban Railway and the Mazowieckie Railway, which finish the run at the Warsaw Waver station, will run to the Warsaw East Station, said Wilgusiak.
He called on passengers to check up-to-date information before travelling.
– The best way to usage our search engine www.portalpasagara.pl, optionally from the carriers, as well as listening to messages at stations and stops – he said.
APW, PAP









