Gawron, Slązak and what's next: a course for modern corvette [Report part 4]

defence24.pl 2 months ago
The following months went on to further item the expected weapons and basic equipment set, approaching the final configuration of the ship. Negotiations were conducted with Naval Shipyard (SMW) and Thales Nederland B.V. and PBP Enamor Sp. z o.o. Finally, on September 23, 2013, an annex No. 15/2013 was signed to the agreement No. 1/BO/2001 between IU and SMW in the presence of Prime Minister Donald Tusk and National Defence Minister Tomasz Siemoniak, at the time in liquidation bankruptcy. In liquidation bankruptcy, due to the fact that in the meantime the shipyard was on the brink of bankruptcy and only specified a legal form allowed its existence to continue. On the part of the plant, the contract has already been signed by the bankruptcy admin Magdalena Smółka, not the board. The annex predicted that SMW would mount on a built patrol vessel platform in the basic version The sledge elements of the combat strategy are the work of both the shipyards and those supplied straight by external producers and the IU as part of shipping and government supplies. The full thing was to be done in specified a way as to accomplish the assumed tactical and method requirements and the full operational efficiency of the ship. The combat strategy was intended to constitute a functional combination of command, water, air and underwater reflection subsystems, control of artillery, navigation and communications. The annex details the deliveries of Thales and Enamor. The yard was obliged to cooperate closely with these producers. Unfortunately, it was an unfortunate puzzle.
Read Entire Article